Water Properly

When the sod is laid, begin watering to build up the sub-soil moisture.

●  This is the most critical time to apply water.

●  May require up to 1/2 inch of water per day for the first 2-3 days.  Total amount to be applied over 2 -3 periods each day.

●  Probe the soil to determine if the moisture has penetrated at least 4 inches.

Install Sod Immediately After Delivery

●  Installing sod on dry ground is preferred.

●  Arrange the rolls so there is a minimum amount of traffic on the prepared soil and the newly installed grass.

●  Lay sod in a horizontal brick pattern.

●  Once an area of approximately 20 feet by 25 feet has been laid, water immediately. The objective is to not let the sod dehydrate.

●  Butt ends and sides of the sod strips making sure there is no overlapping.

●  Fit the sod around obstacles or in smaller places by merely cutting the dirt side with a sharp knife or shovel.

Be sure you have on site hoses and sprinklers for the initial watering.

●  Make sure sprinkler system is performing properly.

●  Understand the operation of your sprinkler clock for proper watering of the new sod  and established lawn.

HomeBenefits of Sod  Lawn Care 

©2009 Green Hills Sod. All Rights Reserved

" Quality & Service "

 
 

Home    Benefits of Sod    Lawn Care       

Green Hills Sod Farm, Inc.  "Quality & Service" 

 Phone: 970-535-4317 or 800-458-3644  Fax:  970-535-4386

Sod Installation Guide — Getting Ready

Prepare your site prior to the arrival of the sod. Remember to do the following:

●  Remove weeds and debris.

●  Establish a rough grade and eliminate low spots.

●  Spread and rototill 3 - 6 cubic yards of organics per 1,000 square feet at least 4 inches deep.

●  Level and rake the installation site until it is smooth.

●  Grade areas along sidewalks and driveways approximately 3/4 inches below top of concrete.