Water Properly When the sod is laid, begin watering to build up the sub-soil moisture. ● This is the most critical time to apply water. ● May require up to 1/2 inch of water per day for the first 2-3 days. Total amount to be applied over 2 -3 periods each day. ● Probe the soil to determine if the moisture has penetrated at least 4 inches. Install Sod Immediately After Delivery ● Installing sod on dry ground is preferred. ● Arrange the rolls so there is a minimum amount of traffic on the prepared soil and the newly installed grass. ● Lay sod in a horizontal brick pattern. ● Once an area of approximately 20 feet by 25 feet has been laid, water immediately. The objective is to not let the sod dehydrate. ● Butt ends and sides of the sod strips making sure there is no overlapping. ● Fit the sod around obstacles or in smaller places by merely cutting the dirt side with a sharp knife or shovel. ![]() ![]() Be sure you have on site hoses and sprinklers for the initial watering. ● Make sure sprinkler system is performing properly. ● Understand the operation of your sprinkler clock for proper watering of the new sod and established lawn. ©2009 Green Hills Sod. All Rights Reserved " Quality & Service " Green Hills Sod Farm, Inc. "Quality & Service" Phone: 970-535-4317 or 800-458-3644 Fax: 970-535-4386 Sod Installation Guide — Getting Ready Prepare your site prior to the arrival of the sod. Remember to do the following: ● Remove weeds and debris. ● Establish a rough grade and eliminate low spots. ● Spread and rototill 3 - 6 cubic yards of organics per 1,000 square feet at least 4 inches deep. ● Level and rake the installation site until it is smooth. ● Grade areas along sidewalks and driveways approximately 3/4 inches below top of concrete.
|